Bridge #385 - CR 18 / Hively Ave over Yellow Creek
Current ProjectsLocation: Between CR 13 and Hammond Ave.
Designed By: GAI Consultants
Contractor: To Be Determined
Anticipated Construction: 2027
Estimated Cost: $2,700,000
Funded By: 80% Federal, 20% Local
Summary: Deterioration of this bridge requires it to be posted with a weight limit of 17 Tons. This project will completely replace the existing structure with a new bridge.