Bridge #385 - CR 18 / Hively Ave over Yellow Creek

Current Projects
Location: Between CR 13 and Hammond Ave. 

Designed By: GAI Consultants 

Contractor: To Be Determined 

Anticipated Construction: 2027 

Estimated Cost: $2,700,000 

Funded By: 80% Federal, 20% Local 

Summary: Deterioration of this bridge requires it to be posted with a weight limit of 17 Tons. This project will completely replace the existing structure with a new bridge.