Bridge #361 - N. Main Street over Christiana Creek
Current ProjectsLocation: Between Beardsley Ave. and Simonton St.
Designed by: Elkhart County Highway
Contractor: To Be Determined
Start Date: 2025
Completion Date: 2025
Estimated Cost: $1,600,000
Funded by: 100% Local
Summary: This bridge was constructed in 1952 and has several elements that are in poor condition. The deterioration requires the bridge to be posted with a 29-ton weight limit. It will be rehabilitated by rebuilding a portion of the existing abutments and replacing the bridge deck and sidewalks. Many of the existing steel beams are in good condition and will be reused. The work will require the road to be completely closed during construction, which is expected to take about 8 months to complete.