Bridge #152 - Mishawaka Road over Yellow Creek
Past ProjectsLocation: Between US 33 and Minuteman Way
Designed by: Lochmueller Group
Contractor: Milestone Contractors
Construction Start Date: 2022
Completion Date: 2023
Estimated Cost: $3,000,000
Funded by: 80% Federal, 20% Local
Project Summary: This bridge is structurally deficient as a result of beam deterioration but does not have a weight limit. The bridge will be completely replaced as part of the work. The work will be performed using partial width construction so that 2 lanes of the 4-lane road will be open at most times during construction.