BR 253 - CR 1 over Baugo Creek

Current Projects

Location: Between CR 36 and CR 38

Designed by: Elkhart County Highway

Contractor: To Be Determined

Start Date:  2025

Completion Date: 2025

Estimated Cost:  $600,000

Funded by:  100% Local

Summary: This bridge, constructed in 1964, is in serious condition due to beam deterioration. The deterioration requires the bridge to be posted with a 25-ton weight limit. It will be rehabilitated by replacing the beams and the bridge deck wearing surface. The work will require the road to be completely closed during construction, which is expected to take about three months to complete.