Bridge 193 - CR 43 over Stoney Creek
Current ProjectsLocation: Between CR 40 and CR 42
Designed by: SJCA Inc.
Contractor: To Be Determined
Start Date: 2025
Completion Date: 2025
Estimated Cost: $600,000
Funded by: 100% Local
Summary: This bridge was constructed in 1970 and is in poor condition due to beam deterioration. The deterioration requires the bridge to be posted with a 10-ton weight limit. It will be rehabilitated by replacing the beams and the bridge deck wearing surface. The work will require the road to be completely closed during construction, which is expected to take about 3 months to complete.