Bridge 193 - CR 43 over Stoney Creek

Current Projects

Location: Between CR 40 and CR 42

Designed by: SJCA Inc.

Contractor: To Be Determined

Start Date:  2025

Completion Date: 2025

Estimated Cost:  $600,000

Funded by:  100% Local

Summary: This bridge was constructed in 1970 and is in poor condition due to beam deterioration. The deterioration requires the bridge to be posted with a 10-ton weight limit. It will be rehabilitated by replacing the beams and the bridge deck wearing surface. The work will require the road to be completely closed during construction, which is expected to take about 3 months to complete.