Bridge #312 - CR 42 over Turkey Creek

Current Projects

Location:  Between CR 21 and SR 15

Designed by: United Consulting

Contractor: RL McCoy

Start Date:  2025

Completion Date:  2025

Estimated Cost: $2,087,311.09

Funded by: 80% Federal, 20% Local

Summary: This bridge, constructed in 1963, is in poor condition due to beam deterioration. The deterioration requires the bridge to be posted with a 24-ton weight limit. For this project, it will be completely replaced with a single-span bridge. The work will require the road to be completely closed during construction, which is expected to take about seven months to complete. The completion date is August 13, 2025.